Definition
AOP - All Over Print
A print that covers an entire panel or entire garment. Normally the print repeats and often the entire length of fabric will be printed
ASAP - As Soon As Possible
Not really a fashion term but you are gonna see it regularly
AWB - AirWay Bill
A receipt issued by an international airline for goods
BND - Back Neck Drop
The measurement from the HSP to the lowest point at the edge of the back neckline
BNL - Back Neck Label
A label sewn inside the back neck
BNT - Back Neck Tape
A tape sewn inside the back neck at the collar
BOM - Bill Of Materials
A document itemising everything needed to create the finished garment
BULK - Not an acronym
When sampling’s finished and approved and you are ready to start producing the main order, ‘start the bulk production’
C&S - Cut and Sew
Pieces of fabric sewn together to make a garment. Normally as a designer, it involves adding some paneling to a simple garment
CAD - Computer-Aided Design
A term for a garment drawing made on the computer
CB - Centre Back
The vertical measurement dissecting the back left and right side in the middle of the two
CC - Colour Card or Colour Chart
CF - Centre Front
The vertical measurement dissecting the front left and right side in the middle of the two
CMT - Cut, Make, Trim
This is what happens once the factory receives the pattern and fabric
CNY - Chinese New Year
A major holiday in China which may affect any dealings you have with China
CW - Cuttable Width
The width of a fabric minus the selvedge
DL - Deskloom
A sample length of fabric used for checking colours and patterns
DTM - Dyed To Match
Often seen on tech packs
EOD - End Of Day
ETA - Estimated Time of Arrival
ETD - Estimated Time of Departure
FBA - Fulfillment By Amazon
Amazon’s gonna sort it
FDS - Fabric Detail Sheet
A detailed description of the merchandise
FND - Front Neck Drop
The measurement from the HSP to the lowest point at the edge of the front neckline
FOB - Free On Board
This means the seller covers the expense of shipping to a certain point, so for example the factory may say FOB Hong Kong Port meaning they will load the goods and get them to the port and you responsible for all other costs and liabilities from then on
FPT - Fabric Performance Test
A mandatory test report on fabrics that can be requested for approval
FTD - Fabric Technical Data
The breakdown of a fabrics makeup/composition/technicalities
FTY - Factory
A lazy way of writing factory
FW - Full Width
The entire unfolded width of a piece of fabric
GG - Gauge
Often used in knitwear, it refers to the number of stitches in a row and how tightly they are knitted
GPT - Garment Performance Test
A mandatory test report on garments that can be requested for approval
GSM - Grams per Square Metre
A term used in textiles to measure the weight of a fabric
GTM - Go to market
HKG - Hong Kong
An important destination on trips to the far east, as it can be the gateway to manufacturing in China
HSP - High shoulder point
The point at the top of your shoulder where it meets the neck
LD - Lab dip
A sample of the fabric that has been dyed to your requirements
LHSAW - Left-hand side as worn
LS - Long sleeve
MCQ - Minimum colour quantities
Similar to MOQ this splits down the minimum quantity you need to place with a factory per colourway
MMENT - Measurement
MOQ - Minimum order quantity
A factory term for the least amount of an item they will produce
NSA - No seam allowance
This measurement doesn’t include allowance for stitching
OOO - Out of Office
Give the person a break. They’ve had enough of your BS.
OOS - Out of stock
OPD - Order placement date
The date orders need to be placed if you are going to hit your expected delivery date
OTB - Open to buy
A financial budget for merchandise buyers
PO - PO
A commercial document and first official offer issued by a Buyer to a Vendor indicating types, quantities, and agreed prices for products or services. Often these need to be “raised” or created.
POM - Point Of Measure
A point of measure is the place where a measurement starts and finishes. This is broken down into a whole world of POM abbreviations that you will find in this list.
PP or PPS - Pre-Production Sample
A pre-production sample is made with actual fabric and trims and is essentially what the final garment should look like
PPI - Picks Per Inch
The number of weft threads per inch of woven fabric
QTY - Quantity
RAS - Risk appetite statements
Produced for key levels within an enterprise; commencing at the Board and cascading down the enterprise
RFD - Ready For Dyeing
RHSAW - Right-Hand Side As Worn
RPT - Repeat
Usually referring to a graphic print that repeats
SKU - Stock Keeping Unit
This is used to sort out the inventory of a fashion collection. Each piece of a collection is recorded, usually broken down into each piece and each colourway for that piece.
SMS - SalesMan Sample
Scaled-down versions of real products used to demonstrate features to retailers or potential customers
SO - Sample Order
A sample ordered from the factory. Or it can also mean…
SO - Strik Off
A strike-off is a sample of a print or a fabric provided by the factory for you to check before they proceed. Designers often request a strike-off to check that their idea works in reality how they imagined.
SPEC - Technical Specification document or Spec Sheet
Displaying all the measurements and other technical information to give a detailed overview of a garment
SPI - Stitches Per Inch
The number of stitches per inch used on a sewing machine
SPM - Stitches per minute
The number of stitches a sewing machine can achieve
SS - Short Sleeve
SS - Side Seam
The vertical measurement running down the side from the underarm to the hem in between the front and the back of the garment
SS - Size Set
A complete set of samples in all the different sizes
TBA - To Be Advised
Often written on tech packs when details are yet to be defined
TNA - Time And Action
A calendar for recording and following up on important milestones of a collection from conception to delivery
TOD - Time Of Delivery
TP - Tech Pack
A technical pack that breaks down all the design details of a garment
WC - Week Commencing
WH - Warehouse
XFD - Ex-Factory Date
The date on which the supplier needs to have the shipment ready to move from the factory to the shipment forwarder
YTD - Yarn Technical Data
The breakdown of yarns specifications